PROCESS
For us, safety has always been and remains our top priority. Every decision we made during this project took structural integrity into account.
We began by completely dismantling the damaged terrace, carefully removing all materials affected by the fire down to the foundation level. This step was absolutely critical to ensure that no damaged elements remained before restoration began.
Next, our team of specialists erected a new reinforced frame. It was designed to meet load-bearing requirements and withstand Fair Oaks’s seasonal weather conditions.
After erecting the frame, we carefully installed Trex composite decking.
Our final step was a quality inspection to ensure that every component met all safety and performance standards.